EPMB reports more assembly capacity in Pegoh and targets its RM200 million paint facility for August 2027. Local parts and completed work matter more than headline capacity alone.
Pemandu bas mengaitkan kejadian di Taman Bagan dengan arahan navigasi. Panduan Waze tidak menawarkan profil bas dengan ukuran ketinggian; punca rasmi kejadian masih perlu dibezakan daripada keterangannya.
The latest Malaysian preview puts GWM’s hybrid crossover back on buyers’ radar. Its announced launch window is November; final pricing still needs confirmation.
Laporan baharu menyorot proses permohonan MPS. Kelulusan majlis, kerja elektrik dan khidmat perunding perlu diperiksa mengikut keadaan rumah, bukan dicampur menjadi satu “harga permit”.
A fresh Malaysian tyre guide raises an easily missed ownership cost. Rotation, cold pressure and the correct load rating matter more than an EV label on the sidewall.
The locally assembled SUV comes with petrol-turbo and Hybrid+ choices. Compare the written offers, warranty terms and your own driving needs before counting savings.